In quality control, ------------ represents the cost incurred for all the materials and activities when the job has not been done right the first time.
Daily maintenance activities are entered in
In-------------, repair of broken or damaged piece of equipment is done to restore necessary operating condition.
------------- breakdowns result in small amounts of lost time but are very frequent in occurrence.
-------------- are classified as the lost time and materials after the makeready is complete and production sheets are being counted
Maintenance done before the parts getting worn-out is