A man does double the work done by a boy in the same time. The number of days that 3 men and 4 boys will take to finish a work which can be done by 10 men in 8 days is

  • 4
  • 16
  • 7 3/11
  • 8 4/5
A man does double the work done by a boy in the same time. The number of days that 3 men and 4 boys